Appendix; Appendix A: Installing A Changer Unit - Panasonic LB-DH7 Series Installation Manual

Data archiver
Hide thumbs Also See for LB-DH7 Series:
Table of Contents

Advertisement

Installation of this unit

Appendix

Appendix A: Installing a changer unit

Work flow
Changer unit checks: pattern 1
1 Remove the gear rack fixture.
2 Elevate the changer unit.
3 Secure the gear rack.
4 Check the changer unit installation.
0.09 mm (0.004q) gap
gauge can enter.
Changer unit checks: pattern 2
1 Slide the top of the changer unit.
2 Release the clutch levers of the
changer unit.
3 Elevate the changer unit.
4 Return the clutch levers of the
changer unit to their original positions.
5 Check the changer unit installation.
0.09 mm (0.004q) gap
gauge can enter.
The problem is caused by a fault with the
module, so contact the vendor.
No
Yes
No
Yes
ACCEPT
Changer unit checks: pattern 1
1
Remove the gear rack fixture.
≥ Loosen the three screws of the gear rack on the drawer
side (do not remove them to secure the gear rack later).
≥ Rotate two clamping levers in the left and right
counterclockwise to loosen.
59
Clamping lever

Advertisement

Table of Contents
loading

Table of Contents