Huawei SmartDC V100R021C10 User Manual page 131

Data center controller
Hide thumbs Also See for SmartDC V100R021C10:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Address
3
4
Step 2 Add an eLight.
1.
2.
3.
Step 3 Set eLight parameters.
1.
2.
3.
Issue 04 (2021-10-09)
Toggle
Switch 1
ON
OFF
Log in to the ECC800-Pro WebUI as an administrator.
Add an eLight.
Table 5-12 Adding an eLight
Path
Choose System
Settings > Device
Management and click
Add Device. The
parameters for adding
devices are displayed.
Click Test Connect to check whether the eLight Actuator connects properly.
If the connection succeeds, click Confirm. The connected devices are
displayed in the Number of connected devices list.
If the connection fails, check whether the cable is properly connected to
the device, whether the device is running properly, and whether the
parameter settings are consistent with the device parameters.
Log in to the ECC800-Pro WebUI as an administrator.
Choose Monitoring > Aisle > eLight Actuator Group > eLight Actuator. The
Running Parameters page is displayed.
Select the Associated alarm severity as required and click Submit.
Copyright © Huawei Technologies Co., Ltd.
Toggle
Toggle
Switch 2
Switch 3
ON
OFF
OFF
ON
Parameter
Setting
Device
Select eLight Actuator from the
attribute
drop-down list box.
Device Type
Select eLight Actuator from the
drop-down list box.
Connect To
Select ETH Converter1 from the
drop-down list box.
NOTE
In this example, the eLight actuator
is connected to ETH converter 1.
Communicati
COM1/COM2
ons Port
Device
Set the device address for the
Address
eLight actuator based on the
actual situation.
5 Power-On Commissioning