Commissioning The Smart Busbar - Huawei SmartDC V100R021C10 User Manual

Data center controller
Hide thumbs Also See for SmartDC V100R021C10:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Type

5.5 Commissioning the Smart Busbar

Context
Procedure
Step 1 Set parameters for general input units on the ECC800-Pro WebUI.
1.
Issue 04 (2021-10-09)
Error Code
554
550
421
450
451
534
In the smart busbar scenario, general input units and power distribution units
communicate with the ECC800-Pro using the Modbus-MAC protocol. After the
general input units and power distribution units properly connect to the
ECC800-Pro, the ECC800-Pro automatically identifies the units.
Then, you need to set parameters for the general input units and power
distribution units; otherwise, a false alarm may be generated.
Set parameters for general input unit 1.
Copyright © Huawei Technologies Co., Ltd.
Suggestion
1. Log in to the email server or contact the
personnel of the third-party email server to
modify the spam setting rule.
2. Provide ECC run logs and contact the service
center.
1. Log in to the email server or contact the
third-party email server personnel to add
the IP address to the whitelist.
2. Provide ECC run logs and contact the service
center.
Reduce the email sending speed or contact the
third-party email server personnel to increase
the email server configuration limit.
Contact the personnel of the third-party mail
server to add the sender address to the
whitelist and do not limit the sending rate.
Provide ECC run logs and contact the service
center to reduce the email sending frequency.
Log in to the sender's mailbox client and
enable the access to the insecure applications.
5 Power-On Commissioning
113