Asset Management; Commissioning The Smart U Space Manager (Connected To A Rack Environment Unit); Determining The Position Of The Smart U Space Manager - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)

6.10 Asset Management

Asset Management Flowchart
6.10.1 Commissioning the Smart U Space Manager (Connected to
a Rack Environment Unit)

6.10.1.1 Determining the Position of the Smart U Space Manager

If a smart U space manager is installed, perform the following steps to configure it.
Prerequisites
Connect the smart U space manager to the COM1 or COM2 port on the rack environment
unit.
Procedure
Step 1 Log in to the ECC800-Pro WebUI as an administrator.
Step 2 View the position of the smart U space manager.
1.
Issue 06 (2020-04-22)
Choose Monitoring > Cabinet > IT Cabinet > Smart U Space Manager.
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
182

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800-pro

Table of Contents