ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Item
NOTE
Step 4 If there are multiple eLights, repeat
----End

5.8 Commissioning the PDU2000 (for FusionModule800)

When the system type is FusionModule800 and a PDU2000 is installed, perform the
following steps to configure it.
Prerequisites
Connect one end of the straight-through cable to the COM port on the PDU2000 and the other
end to the COM port on the ETH converter.
Context
Table 5-12 PDU2000 basic Information
Vendor
Clever
Haipengxin
a: The barcode starts with 21 and is attached to the device.
Procedure
Step 1 Set the PDU2000 monitoring parameters.
Issue 06 (2020-04-22)
Alarm Severity
Selection
None
After you set the alarm severity, the eLight indicator is off if no alarm is generated.
Set the PDU2000-M (C) monitoring parameters.
The display of a single-phase module is used as an example.
Copyright © Huawei Technologies Co., Ltd.
Description
Critical: red light
Major: orange light
Minor: yellow light
Warning: white light
The eLight strip light is steady blue
(atmosphere light).
Step 1–Step
3.
Name
Displayed on
the WebUI
PDU2000-M(C)
PDU2000-M(H)
5 Power-On Commissioning
Eleventh and Twelfth
Characters in Device
Barcode
a
FT
6B
109