5.7 Commissioning the eLight (for
FusionModule500/800)
When the system type is FusionModule500/800 and an eLight is installed, perform
the following steps to configure it.
Procedure
Step 1 Ensure that the device address of the eLight actuator is the default value 2.
Toggle switches 1 to 4 of the DIP switch specify the device address in binary mode.
ON indicates 1, and OFF indicates 0.
Table 5-11 Setting a device address
Address
1
2
Issue 04 (2021-10-09)
Table 5-10 Function commissioning
Item
Associated
alarm severity
NOTE
After you set the alarm severity, the eLight indicator is off if no alarm is generated.
Toggle
Switch 1
ON
OFF
Copyright © Huawei Technologies Co., Ltd.
Alarm Severity
Selection
Critical
Critical, Major
Critical, Major,
Minor
Critical, Major,
Minor, Warning
None
Toggle
Switch 2
OFF
ON
5 Power-On Commissioning
Description
If there is a critical alarm, the
eLight strip light turns on with a
red light.
If there are multiple alarms, the
eLight strip light preferentially
turns on with a light
corresponding to the high-
severity alarm. After the high-
severity alarm is cleared, the
eLight strip light turns on with a
light corresponding to the low-
severity alarm.
NOTE
● Critical: red light
● Major: orange light
● Minor: yellow light
● Warning: gray light
The eLight strip light is steady
blue (atmosphere light).
Toggle
Toggle
Switch 3
Switch 4
OFF
OFF
OFF
OFF
118