Test Voltage - Siemens SITOP UPS1600 Equipment Manual

Hide thumbs Also See for SITOP UPS1600:
Table of Contents

Advertisement

Safety, approvals, EMC

9.2 Test voltage

9.2
Test voltage
Figure 9-1
Only applicable for UPS1600 with PROFINET (-2AY0).
Only the manufacturer can perform the type test and production test; users can also perform
the field test.
Preconditions for performing the field test:
Test (A)
• Connect the input, output, battery connection BAT and signaling contact with one another
and measure with respect to PE.
Test (B)
• Connect all PROFINET cables and measure with respect to PE (input, output, battery
connection BAT signal connector and PE are connected with each other)
Table 9- 1
Test voltage
Type test
Production test
Field test
Remark:
Tripping current for DC measurement: 0 mA
Tripping current for AC measurement: < 100 mA
254
Test voltage diagram
Test time
Input, output, BAT ↔ PE (A)
60 s
700 V DC
60 s
500 V AC
1 s
200 V DC
1 s
140 V AC
1 s
200 V DC
1 s
140 V AC
PROFINET ↔ PE (B)
2200 V DC
1500 V AC
2200 V DC
1500 V AC
SITOP UPS1600 / BAT1600 / UPS1100
Equipment Manual, 07.2021, A5E37775406-11-76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents