Power Control Procedures Preview - Dell PowerStore 1000 Installation And Service Manual

Table of Contents

Advertisement

For more information about the service scripts, see the PowerStore Service Scripts Guide.
● If both nodes in an appliance reboot in service mode, always return Node A to normal mode first to avoid management
software conflicts. After Node A is operating normally, you can return Node B to normal mode.
● Before powering down an appliance with metro volumes, ensure that the role of the metro volumes on the appliance are all
set to non-preferred. Refer to the Protecting Your Data guide for details about setting metro volume roles.

Power control procedures preview

CAUTION:
Do not power off by pulling cables from the back of the appliance to initiate a shutdown sequence.
Use PowerStore Manager or a service script to perform all graceful shutdown operations.
The following table provides a preview of the steps that are required to power off or up the relevant component in your cluster:
Table 10. Power control procedures preview
Component
Node
Appliance
Cluster
176
Power control procedures
Action
Power off
Power on
Reboot
Power off
Power on
Reboot
Power off
Power on
PowerStore T model
Use PowerStore Manager.
Or
Run a service script.
● If the node was removed
from the chassis, reseat
the node into the chassis,
and reconnect its power
cable.
● If the node was not
removed from the chassis,
run a service script.
Use PowerStore Manager.
Or
Run a service script.
Use PowerStore Manager.
Or
Run a service script.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power
cables in the right order.
Run a service script.
Use PowerStore Manager.
Or
Run a service script.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
PowerStore X model
Use VMware vCenter server.
● If the node was removed
from the chassis, reseat
the node into the chassis,
reconnect its power cable,
and use VMware vCenter
server.
● If the node was not
removed from the chassis,
run a service script and
use VMware vCenter
server.
Use VMware vCenter server.
Use PowerStore Manager.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power
cables in the right order, and
use VMware vCenter server.
Use VMware vCenter server.
If the nodes or expansion
enclosures were removed
from the chassis, reseat
the expansion enclosures
and nodes. Reconnect power

Advertisement

Table of Contents
loading

Table of Contents