Powering Off Procedures For Powerstore Node; Power Off A Powerstore T Model Node Using Powerstore Manager; Power Off A Powerstore T Model Node Using A Service Script - Dell PowerStore 1000 Installation And Service Manual

Table of Contents

Advertisement

Table 10. Power control procedures preview (continued)
Component

Powering off procedures for PowerStore node

This section includes the following procedures:

Power off a PowerStore T model node using PowerStore Manager

Power off a PowerStore T model node using a service script

Power off a PowerStore X model node
Power off a PowerStore T model node using PowerStore Manager
Prerequisites
Obtain the following information:
● Management IP address of the cluster to log in to PowerStore Manager
● PowerStore Manager user account credentials with administrator privileges
NOTE:
Do not power off or reboot a node if the peer node is not operating normally. If the peer node is experiencing any
major issues, associated alerts and events appear in PowerStore Manager.
Also, to avoid service interruptions, ensure that there are sufficient and healthy paths from all connected hosts to the peer
node.
About this task
Use the following procedure to power off (power down) a PowerStore T model node using PowerStore Manager:
NOTE:
If you are unable to access PowerStore Manager, see
Steps
1. Under Hardware, select the appliance that includes the node you want to power off.
2. On the Appliance Details page, select the Components card.
3. On the Components card, under Rear View, expand Base Enclosure, and then select the node that you want to power
off.
4. Under More Actions, select Power Down.
5. On the confirmation prompt, enter the service password, and then click Power Down.
Next steps
To verify that the node has powered off, check the status of the LEDs in the rear of chassis. Other than the LEDs for the power
supply unit, management port, and service port, all LEDs on the node must be OFF. The Unsafe to Remove LED on the active or
peer node is ON.
Power off a PowerStore T model node using a service script
Prerequisites
Obtain the following information:
● Management IP address of the appliance that contains the node. In PowerStore Manager, go to Settings > Networking >
Network IPs > Management. Review the Management IPs table to identify the management IP address associated with
the appliance.
● Service account credentials
Action
PowerStore T model
and nodes. Reconnect power
cables in the right order.
Power off a PowerStore T model node using a service
PowerStore X model
cables in the right order, and
use VMware vCenter server.
Power control procedures
script.
177

Advertisement

Table of Contents
loading

Table of Contents