Commissioning
13.1
Overview
Introduction
This section includes information on the following topics:
• Check before powering on for the first time
• Removing/inserting the SIMATIC memory card
• First power-on of the SIMATIC Drive Controller
• Downloading a project to the device
• Operating states of the SIMATIC Drive Controller
• Operating states of the SINAMICS Integrated
• Runtime licensing
• CPU memory reset: automatic and manual
• Backing up and restoring the CPU configuration
• Backup/restore of SINAMICS NVRAM data
• Time-of-day synchronization
• Identification and maintenance data
• Shared commissioning of projects
264
13
SIMATIC Drive Controller
System Manual, 11/2023, A5E46600094-AD