Application Planning; Incoming Inspection Of The Devices; Checking The Delivery For Completeness And Correctness - Siemens SICHARGE UC 150 UL Installation And Operation Manual

Plug-in dispenser
Table of Contents

Advertisement

SICHARGE UC 150 UL Plug-in Dispenser | Installation and Operations Manual
SECTION 4

Application planning

4.1

Incoming inspection of the devices

4.1.1 Checking the delivery for completeness and correctness

When the carrier delivers the SICHARGE UC dispenser, you should immediately perform
an incoming inspection of the devices.
Checking delivery
Begin the incoming inspection of the equipment with the following steps:
• Check the completeness of the delivery
• Check that the delivery documents correspond to the goods delivered
Additional material
The following is transferred directly to the customer during the transfer process:
• Documents
• Password
Note
Disclaimer of liability
Customers are responsible for safekeeping of the documents and objects received. Siemens is not
obligated to reproduce transferred documents and objects.
Siemens is not liable for the improper use of intelligent devices.
30

Advertisement

Table of Contents
loading

Table of Contents