Floor Mounting; Mounting The Dispenser On The Floor - Siemens SICHARGE UC 150 UL Installation And Operation Manual

Plug-in dispenser
Table of Contents

Advertisement

Grounding instructions
This unit is to be connected to a grounded, metal permanent wiring system; or an equipment-grounding
conductor is to be run with circuit conductors and connected to an equipment-grounding terminal or lead
on the SICHARGE UC charging station. Connections to the SICHARGE UC charging station shall comply with
all local codes and ordinances.
Cable routing considerations
All circuits (incoming AC power wiring, DC wiring to dispensers and communications wiring) should be
ran in separate conduit runs until reaching the cable gland plates.
5.2

Floor mounting

5.2.1 Mounting the dispenser on the floor

To mount the SICHARGE UC dispenser at the location, you must lift the SICHARGE UC
dispenser off the transport pallet. If the SICHARGE UC dispenser is heavy, transport it to the prepared
mounting area using a forklift.
Lifting the SICHARGE UC dispenser
To lift the SICHARGE UC dispenser off the transport pallet, follow these steps:
1. Connect the transport lugs of the SICHARGE UC dispenser and the lifting equipment.
Only use suitable and approved lifting equipment.
2. Lift the SICHARGE UC dispenser vertically from the transport pallet.
3. Transport the SICHARGE UC dispenser suspended to the location.
Required tools and fasteners
To mount the SICHARGE UC dispenser, you need the following tools:
• Torque wrench
• Hexagonal socket
The mounting material is not included in the scope of delivery. We recommend the following
fixing material for mounting the SICHARGE UC dispenser to the base area:
• 6 bolt anchors M12
• 6 washers M12
• 6 nuts M12
Installation and Operations Manual | SICHARGE UC 150 UL Plug-in Dispenser
49

Advertisement

Table of Contents
loading

Table of Contents