Siemens SICHARGE UC 150 UL Installation And Operation Manual page 61

Plug-in dispenser
Table of Contents

Advertisement

Preparing the SICHARGE UC dispenser for switch-on
Switch on the following switching elements at the SICHARGE UC charging station for the power supply cable of the
SICHARGE UC dispenser:
• Backup fuse
• Residual current operated circuit breaker
Automatic startup
The SICHARGE UC dispenser starts automatically. Wait until the SICHARGE UC dispenser has started up completely.
When the display shows the "Start" menu, the SICHARGE UC dispenser is ready for operation.
Figure 7-1
"Start" menu
Installation and Operations Manual | SICHARGE UC 150 UL Plug-in Dispenser
61

Advertisement

Table of Contents
loading

Table of Contents