Fujitsu PRIMERGY RX200 S2 User Manual page 103

Hide thumbs Also See for PRIMERGY RX200 S2:
Table of Contents

Advertisement

4
Click [Start].
Installation starts. At steps where the CD-ROM for resources such as the OS to be installed is
necessary, the resource is automatically acquired from the resource server via the network.
5
Eject the CD-ROM and floppy disk and click [OK].
The system restarts. When the installation is completed, an installation completion message
appears on the target server.
6
Press any key on the target server.
7
Restart the system on the target server.
The server setup and OS installation have been completed.
Refer to "Chapter 5 Operations after OS Installation" ( pg.127) and perform necessary procedures
before starting server operations.
PRIMERGY RX200 S2 User's Guide
3
103

Advertisement

Table of Contents
loading

Table of Contents