Other Notes On Operation - Fujitsu PRIMERGY RX200 S2 User Manual

Hide thumbs Also See for PRIMERGY RX200 S2:
Table of Contents

Advertisement

Chapter 5 Operations after OS Installation

5.5.6 Other Notes on Operation

■ Unnecessary Files
After OS installation is completed, folders named Runonce and Runonce 2 may be left in the drive
where the OS is installed. Delete these folders since you do not need them for the system operation.
■ Notes on 24-hour Operation
Automated System Operation
To provide an extra margin of safety against unintentional damage, introduce disaster-prevention
measures in the office and keep disaster prevention personnel (such as a security guard or janitor) in the
building.
Unintentional Power-off Prevention
We recommend the installation of a special power supply device (such as a distribution board) to prevent
unplanned power shut-offs.
152

Advertisement

Table of Contents
loading

Table of Contents