Chapter 2 - Dk40 Installation; Inspection; Packaging And Storage; Site Requirements - Toshiba Strata DK40 Installation & Maintenance Manual

Hide thumbs Also See for Strata DK40:
Table of Contents

Advertisement

DK40 Installation
This chapter explains how to install the Strata DK40 system. It includes information on site
requirements, wiring diagrams, and step-by-step instructions on how to install the unit(s), the
ground wiring, AC power cabling, reserve power (battery backup) cabling, and PCB cabling.

Inspection

1.
When the system is received, examine all packages carefully and note any visible
damage. If any damage is found, do not open the packages. Contact the delivery carrier
immediately and make the proper claims.
2.
After unpacking (and before installing), check the system against the packing list and
inspect all equipment for damage. If equipment is missing or damaged, contact your
supplier immediately.
3.
Be sure to retain original packaging materials for re-use when storing or transporting
system hardware.

Packaging and Storage

CAUTION!

Site Requirements

This section defines the installation site requirements necessary to ensure a proper operating
environment for the DK40. Also included are earthing requirements.
electrical/environmental characteristics.)
Strata DK40 I&M Manual Spring 1999
Refer to the Strata DK40 Programming Manual or DK Library CD-Rom for more details.
When handling (installing, removing, examining) PCBs, do not touch the
back (soldered) side or edge connector. Always hold the PCB by its edges.
When packaging and storing the system, remove PCBs from the system cabinet (the
power supply may remain installed in the cabinet for storage and shipment). PCBs
should be packaged in their original antistatic bags for protection against
electrostatic discharge. Be sure to package equipment in its original shipping
containers.
2
(See Table 2-1
for
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents