Topology - Siemens SINAMICS G150 Operating Instructions Manual

Converter cabinet units 75 kw to 1500 kw
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

Operation
6.10 Communication via SINAMICS Link
6.10.2

Topology

Only a line topology with the following structure is permitted for SINAMICS Link.
Figure 6-45
The following entries must be made in the expert list of the Control Units:
● The numbers of the various nodes are entered into parameter p8836 in ascending order,
● Gaps in the numbering are not permitted.
● The associated IP addresses are entered automatically and they are visible in r8951.
● The node with the number 1 is automatically the sync master of the communication link.
● For non-synchronized operation (p8812[0] = 0), a maximum of 64 nodes are possible
● For synchronized operation (p8812[0] = 1), a maximum of 16 nodes (p8811 = 16) with
● For the CBE20 connection, the ports must be used as shown in the diagram above – this
● Ports 3 and 4 of the CBE20 are deactivated for communication via SINAMICS Link.
356
Maximum topology
starting at "1".
(p8811 = 64).
500 µs bus cycle or up to 64 nodes (p8811 = 64) with 1000 µs or 2000 µs are possible
is mandatory. This means that Port 2 (P2) of node n is always connected with Port 1 (P1)
of node n+1.
Converter cabinet units
Operating Instructions, 03/2012, A5E03263466A

Advertisement

Table of Contents
loading

Table of Contents