Siemens SINAMICS G150 Operating Instructions Manual page 65

Converter cabinet units 75 kw to 1500 kw
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

Item
Activity
7
The cable shields must be properly applied and the cabinet properly grounded at the
appropriate points (see "Electrical installation / EMC-compliant installation").
8
The voltage for the fan transformer (-T1-T10) for versions A and C, and the internal
power supply (-T10) for version A (only for option L13, L26, L83, L84, L86, L87)
must be adapted to the supply voltage for the cabinet unit. Larger cabinet units have
2 fan transformers (-T1 -T10/-T20), which must be set together. For units connected
in parallel, the fan transformers must be set together in each sub-cabinet (see
section "Electrical installation / Power connections / Adjusting the fan voltage (-T1
-T10)" and "Electrical installation / Power connections / Adjusting the internal power
supply (-T10)").
9
A yellow warning label is attached at each connection clip to the interference
suppression capacitor.
The warning label must removed from the connection clip (by pulling it off) if the
connection clip is to remain in the unit (operation on a grounded line supply).
The warning label must be removed together with the connection clip if the unit
is operated on a non-grounded line supply (IT system).
(See Chapter "Electrical installation/Power connections/Removing the connection
clip to the interference suppression capacitor for operation on an ungrounded line
supply (IT system)").
10
The type plate can be used to ascertain the date of manufacture. If the period from
the date of manufacture to initial commissioning or the cabinet unit downtime is less
than two years, the DC link capacitors do not have to be re-formed. If the downtime
period is longer than two years, they must be reformed in accordance with the
description found in the section "Maintenance and servicing / Reforming the DC link
capacitors".
11
With an external auxiliary supply, the cable for the 230 V AC supply must be
connected to terminal –X40, while the cable for the 24 V DC supply must be
connected to terminal –X9 (see "Electrical installation / Power connections / External
supply of the auxiliary supply from a secure line").
12
Option L07
dV/dt filter
compact plus
Voltage Peak
Limiter
13
Option L10
dV/dt filter plus
Voltage Peak
Limiter
14
Option L15
Sine-wave filter
Converter cabinet units
Operating Instructions, 03/2012, A5E03263466A
During commissioning, the filter must be selected via STARTER
or AOP30. You are advised to check the selection by ensuring
that p0230 is set to 2.
The required parameters are set automatically (see "Electrical
installation / Other connections / dv/dt filter compact plus Voltage
Peak Limiter (option L07)").
During commissioning, the filter must be selected via STARTER
or AOP30. You are advised to check the selection by ensuring
that p0230 is set to 2.
The required parameters are set automatically (see "Electrical
installation / Other connections / dv/dt filter plus Voltage Peak
Limiter (option L10)").
During commissioning, the filter must be selected via STARTER
or AOP30. You are advised to check the selection by ensuring
that p0230 is set to 3.
The required parameters are set automatically (see "Electrical
installation / Other connections / Sine-wave filter (option L15)").
Electrical installation
4.2 Checklist for electrical installation
Yes
Completed
63