Performance Assurance Checks; Performance Assurance Test - Philips V24CT User's Reference Manual

Cms patient monitoring system volume 1
Table of Contents

Advertisement

Performance Assurance Checks

The following performance assurance checks are designed to be
completed to verify proper operation when:
The performance assurance checks fall into two parts:
You can perform any of the checks in any order you choose. They are
broken up here for organizational sake.
Performanc
To verify your monitor works properly, perform the following
e Assurance

performance assurance test:

Test
The monitor has been installed
An assembly has been repaired
To verify the operation any time the unit is suspect.
1. Verification of overall operation by completing the Performance
Assurance Test
2. Verification of plug-in module operation by completing the
Functional Test procedures.
1. Connect the power cord to the monitor and plug it in to an AC
power source.
2. Turn the monitor on by pressing the ON/OFF button. (The monitor
should complete the start-up after a few moments.)
3. Observe that there is a screen display and no error codes.
If any error codes are displayed, refer to the chapter
"Troubleshooting Instruments" in the Service Guide.
If the screen comes up blank, check that the external power cable is
plugged in. If the screen is still blank, contact your biomedical
engineering department or the Philips representative.
Performance Assurance Checks
Maintenance 13-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V26ctM1165M1166M1167M1175M1176 ... Show all

Table of Contents