NEC Univerge SV8100 System Hardware Manual page 103

Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Figure 3-58 Installing the CHS LARGE BATT BOX using the CHS2U JOINT BRACKET KIT
3.2.2
3-44
CHUYÊN CUNG CẤP TỔNG ĐÀI NEC
5.
Secure the CHS LARGE BATT BOX to the CHS BASE UNIT using
the CHS2U JOINT BRACKET KIT. Refer to
the CHS LARGE BATT BOX using the CHS2U JOINT BRACKET KIT
on page 3-44.
Battery Installation
1.
Loosen screw on front of CHS LARGE BATT BOX. Refer to
3-59 Removing CHS LARGE BATT BOX
Figure 3-59 Removing CHS LARGE BATT BOX Cover
2.
Swing cover outward and detach from CHS LARGE BATT BOX.
http//vietpro.com.vn
UNIVERGE SV8100
Figure 3-58 Installing
Cover.
Installing the SV8100 Chassis
Figure

Advertisement

Table of Contents
loading

Table of Contents