2.2
Floor Mounting the 19" Chassis
The CHS2U controlling and expansion chassis can be mounted on the floor using
the CHS BASE UNIT and the CHS2U JOINT BRACKET KIT.
2.2.1
3-10
CHUYÊN CUNG CẤP TỔNG ĐÀI NEC
CHS2U Chassis Installation
1. Use the template shown in
required spacing before drilling holes for 0.39" (10mm) anchor bolts
(locally procured).
Figure 3-10 Floor Mount Spacing Guide
2. Mark and drill the four holes required for installing the CHS BASE
UNIT.
3. Using anchor bolts, secure the CHS BASE UNIT to the floor. Refer to
Figure 3-11 Secure CHS BASE UNIT with Anchor Bolts on page 3-11
for screw location.
UNIVERGE SV8100
Figure 3-10 Floor Mount Spacing Guide
Installing the SV8100 Chassis
http//vietpro.com.vn
for