The 12LK-L KIT provides twelve additional buttons to ITL or DTL multiline
terminals. The 12LK-L KIT kit:
Mounts directly to top side of terminal
Supports Red and Green LED colors
Figure 5-22 12LK-L Kit
4.5.1
Installing the 12LK-L KIT
To prevent possible damage to the 12LK-L KIT or the
DTL/ITL multiline terminal during installation or
removal, disconnect the line cord/LAN cable and the
AC/DC adapter from the DTL/ITL multiline terminal.
1. Turn multiline terminal upside down.
Only one 12LK-L KIT can be attached to the DTL/ITL multiline
terminal.
2. Pry the right-side panel from the multiline terminal.
3. From the lower left or right corner, pry the Line Key Panel from the
multiline terminal (refer to
on page
5-28).
Figure 5-23 removing the Line Key Panel