3.4.1.11 Resistive Reach Calculations

All distance elements must avoid the heaviest system loading. Taking the 5A CT secondary
rating as a guide to the maximum load current, the minimum load impedance presented to
the relay would be:
Vn
(phase-neutral)
Typically, phase fault distance zones would avoid the minimum load impedance by a margin
of ≥40% if possible (bearing in mind that the power swing characteristic surrounds the
tripping zones), earth fault zones would use a ≥20% margin. This allows maximum resistive
reaches of 7.9 Ω, and 10.6 Ω, respectively.
From Table 2: (see § 3.1.2.4), taking a required primary resistive coverage of 14.5Ω for
phase faults, and assuming a typical earth fault coverage of 40Ω, the minimum secondary
reaches become:
RPh (min)
RG (min)
Resistive reaches could be chosen between the calculated values as shown in Table 10.
The zone 2 elements satisfy R2Ph ≤ (R3Ph x 80%), and R2G ≤ (R3G x 80%).
Phase (RPh) Ω
Earth (RG) Ω
Table 7: Selection of resistive reaches
R3Ph/2 = R4Ph/2 should be set ≤ 80% Z minimum load – ∆R.

3.4.1.12 Power Swing Band

Typically, the ∆R and ∆X band settings are both set between 10 - 30% of R3Ph. This gives a
secondary impedance between 0.6 and 1.8 Ω. For convenience, 1.0 Ω could be set.
The width of the power swing band is calculated as follows:
∆R = 1.3 × tan(π × ∆f × ∆t) × R
Assuming that the load corresponds to 60° angles between sources and if the resistive reach
is set so that Rlim = R
∆R = 0.032 × ∆f × R
To ensure that a power swing frequency of 5 Hz is detected, the following is obtained:
∆R = 0.16 × R
kZ0
=
∠kZ0
=
- Z
=
L0
L1
=
=
°
=
°
=
=
(115 / √3) / 5
/ In
=
=
14.5 x 0.12
=
40 x 0.12
Minimum
Maximum
1.74
7.9
4.8
10.6
LOAD
/2, the following is obtained:
LOAD
LOAD
LOAD
(Z
- Z
) / 3.Z
Ie: As a ratio.
0
1
1
∠ (Z
- Z
) / 3.Z
Set in degrees.
0
1
1
(0.426 + j1.576) - (0.089 + j0.476)
0.337 + j1.1
1.15 / 72.9°
0.79 / –6.5°
0.79
(Set for kZ1, kZ2, kZp, kZ4).
–6.5°
(Set for kZ1, kZ2, kZp, kZ4).
13.3 Ω (secondary)
=
1.74 Ω (secondary);
=
4.8 Ω (secondary).
=
Zone 1
Zone 2
R1Ph = 3
R1Ph = 4
R1G = 5
R1G = 6
Application Notes
MiCOM P40 Agile P442, P444
Zones 3 & 4
R3Ph-4Ph = 8
R3G-4G = 10