Motorola SC 4812ET RF Hardware Installation Manual page 190

Power cabinet
Table of Contents

Advertisement

Index
– continued
Concrete Mounting – Existing Pad, 61
concrete pad, 42
Concrete Pad and Ground System Installation, 42
Concrete pad and ground system installation, 43
Conduit Stub Height Detail, 44
conduit/cable entrance layout, 41
connect the DC battery backup, 99, 140, 159
Connection Materials, 42
crates, 54
CSM, 23
Customer I/O, 23
D
Dangerous voltages, 103, 131
DC Power Cables, 101, 142, 161
DC Power Connect, 73
DC Power Connection, 37
Demarcation Document, 14
Dimensions and Clearances, 26
Dimensions and clearances, 26, 27
documents, 13
Door closure problems, 41
Double–D, 146
Double–D Hole, 148
Drill mounting holes in pad, 38
Duplexer/Directional Coupler DDC, 22, 23, 26
dust masks, 38
E
ear plugs, 38
earth ground, 41
earth ground cables, 80, 95
Elevated Substructure, 64
Equipment identification, 52
Excessive RF energy, 49
Existing Concrete Pad Mounting – Preparation, 37
Exothermic, 43
expansion or optional equipment, 31
190
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
External alarm connector characteristics and requirements,
85
External FRUs, 20
eye–bolts, 62
F
flush, 37
Framing Materials – Concrete Pad, 42
FRU, 108
G
GLI2, 23
Global Positioning System, 87, 111
gravel, 43
ground ring, 41
Ground Rods, 42
Ground System Installation Procedure, 43
Ground Wire Connection, 36
grounding, 31
Grounding Guidelines for Cellular Radio Installations, 14
Grounding Ring , 44
Grounding Ring Detail, 44
H
handling batteries, 68
Heat Exchanger, 60
Heliax, 35
High Leakage current, 103, 131
How the frames are shipped , 53, 54
HSO, 23
I
Indoor Location Preparation, 30
Input and Output Cabling, 81, 96
Inspect, 58
Inspect for Damage, 51, 58
Install the concrete pad and ground system, 43
Installation completion checklist, 108
DRAFT
Apr 2001

Advertisement

Table of Contents
loading

Table of Contents