Motorola SC 4812ET RF Hardware Installation Manual page 79

Power cabinet
Table of Contents

Advertisement

Figure 4-7: Partial Cross–Section View of Battery Compartment
Heater Pad
Power Cables
Factory Installed Cable
Bracket (See Detail)
Factory
Installed Cable
Detail of Factory
Installed Cable
Bracket
Apr 2001
SC
V04.03
(to next battery)
(from ACLC)
Important:
After all of the heater pads have been installed and cables connected, dress the
cables behind the battery shelves in each battery compartment. When dressing
cables, consideration should be given to future accessibility of the cables should
a heater ever need to be replaced. Do not zip tie cables to battery shelves or each
other. Also, do not tangle cables in one another. Ensure cables are routed such
that a heater pad cable connector for one shelf can be pulled up from the shelf
below it without having to remove the batteries below.
4812ET RF and Power Cabinet Hardware Installation Manual
TM
DRAFT
Cabinet Mounting
– continued
Batteries
Front of
Power
Cabinet
Heater Pads
(Under Battery)
79
4

Advertisement

Table of Contents
loading

Table of Contents