Motorola SC 4812ET RF Hardware Installation Manual page 60

Power cabinet
Table of Contents

Advertisement

How to Unpack the SC 4812ET BTS
– continued
Order of unpacking
3
Equipment Identification
Figure 3-1: SC 4812ET RF Cabinet
60
The unpacking process requires that the following procedures be
completed in the order shown:
1. Identify the equipment
2. Unpack the RF Cabinet
3. Unpack the Power Cabinet
4. Inspect the equipment for damage
Use Figure 3-1 and Figure 3-2 to visually identify the SC 4812ET RF
and Power Cabinet, respectively.
SC
4812ET RF and Power Cabinet Hardware Installation Manual
TM
DRAFT
Apr 2001
V03.03

Advertisement

Table of Contents
loading

Table of Contents