Drilling Introduction; Drilling Procedure - Motorola SC 4812ET RF Hardware Installation Manual

Power cabinet
Table of Contents

Advertisement

Site Preparation
– continued

Drilling Introduction

Drilling Procedure

Step
After the cabinet position has been established, the mounting hole location can be marked using the
1
dimensions supplied in Figure 2-5, by using the 1:1 installation template supplied in Appendix G, or
by placing the cabinet over the desired location and tracing the mounting hole locations.
NOTE
– Motorola recommended anchor bolts require 18 mm (11/16") drill size.
n WARNING
– Always wear safety glasses, dust masks, ear plugs, and proper attire when using power equipment.
Remove any loose jewelry and tuck shoe laces into work boots.
Apr 2001
SC
TM
The following includes steps that must be followed to safely drill the
mounting holes. Check the mounting hardware to be used to make sure
you use the correct drill bit sizes.
Motorola recommended anchor bolts (Motorola P/N
CGDS97400036) must be used to assure safety in the
event of an earthquake.
Safety glasses, dust masks, and ear plugs must be worn by
all installation personnel, including those in the immediate
vicinity of personnel operating the drill equipment.
Before beginning, read the following steps in their entirety to familiarize
yourself with the procedure.
Table 2-8: Drilling Procedure
4812ET RF and Power Cabinet Hardware Installation Manual
CAUTION
WARNING
Action
. . . continued on next page
DRAFT
2
47

Advertisement

Table of Contents
loading

Table of Contents