Motorola SC 4812ET RF Hardware Installation Manual page 71

Power cabinet
Table of Contents

Advertisement

Figure 4-3: Mounting Bolt Configuration
CONCRETE PAD
ROOFTOP
Rooftop (Elevated
Substructure) Mounting
Procedure
Apr 2001
SC
TM
V04.03
LARGE FLAT WASHER
Ï Ï Ï Ï Ï
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î Î
SMALL FLAT WASHER
Ï Ï Ï Ï Ï
Ï Ï Ï Ï Ï
MOUNTING
SMALL FLAT
STRUCTURE
WASHER
(I–BEAM)
Mounting the cabinet on a rooftop requires that the roof load carrying
support structure be in place prior to mounting the cabinet. See Chapter
2, "Site Preparation" for details.
Roof load carrying limits must be reviewed and an
appropriate support structure must be installed to support
the RF and Power Cabinet as required.
Once the support structure is in place, follow the procedures in Table 4-3
to mount the cabinet.
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
ANCHOR BOLT
CGDS97400036
Ï Ï Ï
Ï Ï Ï
CONCRETE
M12 X 100 BOLT
INSULATING WASHER
(OPTIONAL)
Ï Ï Ï
LOCK WASHER
M12 NUT
WARNING
Cabinet Mounting
– continued
MOUNTING BRACKET
ISOLATION PAD
LARGE FLAT WASHER
MOUNTING BRACKET
ISOLATION PAD
. . . continued on next page
4
71

Advertisement

Table of Contents
loading

Table of Contents