Motorola SC 4812ET RF Hardware Installation Manual page 61

Power cabinet
Table of Contents

Advertisement

Figure 3-2: SC 4812ET Power Cabinet
Overview
How the Cabinet is Shipped
Apr 2001
SC
TM
V03.03
The purpose of this section is to describe how the SC 4812ET RF and
Power Cabinets are packaged for shipping and how to correctly unpack
the cabinets in preparation for installation.
The cabinets are packed standing up in either cardboard or wood cartons
(see Figure 3-3 and Figure 3-4). The RF Cabinet is shipped fully
assembled and all internal cabling installed. The Power Cabinet is
shipped without the batteries installed.
4812ET RF and Power Cabinet Hardware Installation Manual
DRAFT
How to Unpack the SC 4812ET BTS
– continued
3
61

Advertisement

Table of Contents
loading

Table of Contents