Motorola SC 4812ET RF Hardware Installation Manual page 192

Power cabinet
Table of Contents

Advertisement

Index
– continued
Report any damage, 58
Required documents, 13, 14, 17, 18
RF Cabinet Alarm Cable Connection, 36
RF Cabinet Span and Modem Cable Connection, 36
RF GPS Cable, 36
RF I/O area, 94
RF I/O Plate, 93
RF interference, 49
RGPS Cable, 36
RGPS Head, 48
RGPS Mounting Considerations, 48
Roof load carrying limits, 63
ROOFTOP , 32
Rooftop Mounting Preparation, 40
Rooftop Elevated Mounting Procedure, 41
Rooftop Elevated Substructure Mounting, 63
S
Safety glasses, 38
safety glasses, 38
satellites, 48
Scope of Document, 12
sector configuration, 92
Sector/Carrier Configurations, 92
shipped fully assembled, 53
Shipping Crate, 56, 57
shop vacuum, 40
Side Cable Entry Hole Preparation, 146
Simplified Cabinet Cabling Diagram, 77
Site Document, 13
Site preparation – Overview, 30
sky, 49
snow loading, 32
192
SC
TM
4812ET RF and Power Cabinet Hardware Installation Manual
Static sensitive equipment, 58, 75
submersion, 31, 34, 40
surges, 103, 131
T
Telco Interface Board TIB, 26
Tin Snips, 51
Tools and equipment required, 99, 140, 159
Transmission Lines – RF, 35
Transmit/Receive Module TRX, 25
trenches, 43
U
Unpack/Upright Procedure , 54
unpacking process, 52
V
vandalism, 31, 34
Views of Cabinet Side Walls below Shroud, 147
W
Weight, 33
weight, 32
Whats Next and Cleanup, 13
windstay latch, 60
wrist strap, 75
wriststrap, 58
Z
Zoning requirements, 32
DRAFT
Apr 2001

Advertisement

Table of Contents
loading

Table of Contents