1
Site planning and requirements
The XFC and XRC enclosures, power sources, wiring, and location must
comply with the specifications described in this section.
!
NOTICE – Equipment damage or loss of data. Customers who
supply their own ancillary equipment must ensure that equipment
is compliant with the requirements in this guide.
1.1
Enclosures
The aluminum enclosure consists of a hinged-door box. The door provides a
watertight, corrosion-resistant seal between the outside elements and the
components. It is rated NEMA/TYPE 3R or IP54.
Plan the installation based on enclosure dimensions and battery weight per
model. See the user manual listed in section
more complete dimensions and specifications.
Battery and charger requirements
12 Vdc sealed lead acid battery. Size is dependent on the device
enclosure.
12 Vdc solar panel, 30 W maximum.
External power supply requirements
When used for charging batteries:
15 Vdc nominal at 1.8 amperes (minimum)
15.5 Vdc maximum
Location specification and design
Determine the device installation location. Review the options in
hardware
installation. Ensure the required mounting kits and materials are
available.
The installation location must allow access to the XFC or XRC, power
sources, cables, and connections. More information is available in
battery and charger .
1 0 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
WARNING – Bodily injury. Select compliant equipment listed
in this section or customer provided equipment. Carefully
review the specifications. Failure to comply with these
specifications may create unsafe conditions, resulting in
bodily injury and equipment damage.
Additional information
for
Basic
Install