ABB X Series G5 Startup Manual page 78

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

3.
Verify that the antenna is properly installed:
a.
Properly wired to the radio
b.
Frequency range is correct
c.
Directional antenna is pointed toward the base radio (±6°)
d.
Mounted vertically and the vanes are perpendicular to the
ground
4.
Verify that the base radio (host device, typically running WinCCU) is
working at other locations, using the same frequencies as the remote
radio.
5.
Verify the configuration of the host communication application
(typically WinCCU):
a.
The Station ID and the Device ID match the host settings.
b.
No other device is using the same Station ID or Device ID.
c.
The baud rate, stop bits, security code, and listen cycle time
agree between the host (WinCCU) device and flow computer.
d.
The host (WinCCU) is using packet protocol.
More information about identifying and correcting radio communication
issues is available in the Communication troubleshooting section of the
user manual. See
For troubleshooting other communication equipment, including modems,
cellular equipment, or telephone line, contact the ABB Totalflow main
office, listed under
menu options.
7 6 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
Additional
information.
Contact
us:, and select technical support from the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xfc g5Xrc g5

Table of Contents