— Wiring the RTD leads to the XFC electronic board
WARNING: Bodily injury. Install electrical wiring according to
requirements for the area classification. Refer to the
certification drawing indicated on the device's name tag, and
national and local codes.
Materials:
RTD probe with cable and cable gland installed (probe and cable
length determined by technician)
Nylon tie wraps
Install the RTD probe:
1.
Insert the RTD probe into the thermowell to determine the depth
setting for the probe spring.
Figure 2-4: Typical RTD installation
2.
Use snap-ring pliers to adjust the retaining ring below the spring on
the probe. Probe depth should be set so it is spring-loaded against
the bottom of the thermowell.
2 1 0 60 01M NAA | XSER IE S G5 S TART UP G UI DE | 2 1