Unpack And Inspect - ABB X Series G5 Startup Manual

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

 Pressure calibration device
Install and wire the RTD to the XFC:
 RTD probe with cable and cable gland installed (probe and cable
length determined by technician)
 Nylon tie wraps
Antenna installation:
 Refer to: XSeries
information.
Solar panel installation:
 One (1) solar panel with cable
 One (1) solar panel mounting kit (includes U-bolts, brackets, and
hardware)
 Mounting pipe extension and coupling if required (length determined
by technician depending on the size of the solar panel)
 Nylon tie wraps
Install the battery:
 One (1) battery with cable attached

Unpack and inspect

The XFC and XRC and additional parts ship in a specially-designed shipping
carton with a startup guide and packing list.
IMPORTANT NOTE: Inspect the contents for damage before
discarding the shipping and packing materials.
Unpack the XFC or XRC and inspect for damaged, missing or incorrect
parts:
1.
Inspect the shipping carton for damage.
2.
Carefully remove items from the carton.
3.
Keep all shipping materials to return any damaged or incorrect parts.
4.
Compare the packing list with the materials received. Check for
missing or incorrect parts.
5.
Inspect each item for damage: XFC or XRC exterior, LCD display,
optional equipment if purchased.
6.
If there are missing, incorrect, or damaged parts or noticeable
defects, call the ABB main office number listed in
IMPORTANT NOTE: Do not return equipment to ABB without prior
written consent. Returns are subject to the terms and conditions
specified by ABB.
Wi-Fi antenna kit installation guide. See
G5
2 1 0 60 01M NAA | XSER IE S G5 S TART UP G UI DE | 1 3
Additional
Contact
us:.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xfc g5Xrc g5

Table of Contents