Pipe Mount Installation - ABB X Series G5 Startup Manual

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

Pipe mount installation

IMPORTANT NOTE: Select a mounting location that allows for
easy access, is close to the tap valves, and complies with all
local and national codes.
Materials:
 One (1) enclosure mounting kit (includes instructions, brackets, U-bolts
and fastening hardware)
 One (1) pipe saddle with mounting hardware (size determined by
technician)
 One (1) 2 inch x 40 inch pipe (length may be extended if mounting a
solar panel). See
Pipe-mount the XFC (XRC is similar):
1.
Position the pipe saddle on the meter run and temporarily attach the
saddle to the meter run pipe using the associated hardware.
Figure 2-1: Mounting pipe
3
4
Legend: Mounting pipe
1
Meter run
2
2 inch x 40 inch Mounting pipe
2.
Screw the mounting pipe into the saddle until it is tight.
1 4 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
Figure 3-1: Solar panel
.
2
3
Saddle
4
U Mounting bolt
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xfc g5Xrc g5

Table of Contents