Figure 2-3: XFC with XIMV and 5-valve manifold
Legend XFC with XIMV and 5 valve manifold
1
High side equalizer valve
2
Manifold vent valve
3
Low side equalizer valve
2.
Connect the pressure device to the test port.
3.
Apply pressure to the port based on the transducer range (100% of
range).
4.
Squirt liquid leak detector onto the following connections:
−
High and low pressure tap valve connections
−
High and low pressure manifold tubing connections
−
Connection points between the flange and the manifold
Bubbles in the liquid indicate a loose or poor connection.
5.
Use a wrench to tighten connections, and recheck.
NOTICE – Equipment damage: Do not over-tighten the connections.
After verification that all connections are leak-free, proceed to install the
RTD.
Install and connect the RTD for the XFC
The RTD probe measures flowing gas temperature. The following procedure
describes:
— Installation of the RTD onto the meter run
2 0 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
4
XIMV
5
Enclosure