1.2
Intended audience
1.2.1
General
The Installation and commissioning manual is intended for
authorized installation, commissioning, and maintenance
personnel.
1.2.2
Requirements for personnel
The installation personnel must have a basic knowledge
in how to handle electrical equipment. The commissioning
and maintenance personnel must have good experience
in how to use electrical equipment. ABB personnel must
obey the instructions in ABB CISE 15.4.
1.3
Revision notes and other
documents
For latest information on revisions and other documents
related to the PSTX Softstarters, please see
www.abb.com/lowvoltage. Select the link Control
Products on the site, and then continue to Softstarters.
1.4
Acronyms and abbreviations
Table 3
Acronyms and abbreviations
Acronym/
Description
Abbreviation
BP
Bypass
DOL
Direct-on-line
EOL
Electronic overload
FB
Fieldbus
FBP
Fieldbus Plug
HMI
Human-Machine Interface
I e
Rated operation current
IT
Information Technology
LED
Light Emitting Diode
PCBA
Printed Circuit Board Assembly
PLC
Programmable Logic Controller
PTC
Positive Temperature Coefficient
SC
Short Circuit
SCR
Silicon Controlled Rectifier (thyristor)
TOR
Top of Ramp (full voltage/Full-On)
U c
Rated control circuit voltage, used for
controlling the Softstarter. *
U e
Rated operation voltage on the motor (3 phase
main voltage feeding the motor). *
U s
Rated control supply voltage, feeding the
electronics in the Softstarter. *
*) For definition see IEC 60947-1 edition 5.0