Tools
Hand-held
thermohygrograph
Network cable tester
Step ladder (2 m)
ESD wrist strap
Clamp meter

2.2 Container Entry Requirements

The following describes the requirements for working in the FusionModule1000.
Item
Issue 01 (2019-03-05)
The listed tools are for routine maintenance only. Prepare other tools as required.
Requirement
Copyright © Huawei Technologies Co., Ltd.
2 Operation and Maintenance Preparations
Multimeter
Heat gun
Cable tie
ESD gloves
ESD floor suction plate
Electroprobe
Utility knife
Insulation tape
Protective gloves
Vacuum cleaner