Huawei FusionModule1000A40 ICT Solution Maintenance Manual page 60

Hide thumbs Also See for FusionModule1000A40 ICT Solution:
Table of Contents

Advertisement

FusionModule1000A40 ICT Solution
Maintenance Guide
Documents: battery pack wiring diagram
Skill requirement: power distribution engineer
Procedure
Step 1 Switch off the circuit breaker of the battery in the battery switch box based on the power
supply and distribution system diagram, and remove cables from the rear of the battery pack.
Step 2 Remove screws from the cabinet, and remove the battery pack.
Step 3 Loosen the battery pack, and remove screws from the battery pack mounting ears.
Step 4 Install the mounting ears on the new battery pack using eight M4 screws.
Figure 4-3 Installing mounting ears
Step 5 Push the battery pack onto the guide rails, and secure the battery pack to the cabinet rack rails
using mounting ears and screws.
Issue 01 (2019-03-05)
For the diagram, see the quick installation guide for the solution in use.
Copyright © Huawei Technologies Co., Ltd.
4 Parts Replacement
53

Advertisement

Table of Contents
loading

Table of Contents