The ventilation floor panel of the hot aisle can be reinstalled after the water refill and
drainage pipes of the air conditioner are removed.
Adjust the height of the floor tray to ensure that the reinstalled floor panels are flush with
other floor panels.
Step 8 Remove fasteners from the top and bottom of the air conditioner.
Figure 4-18 Removing air conditioner fasteners
1.
2.
Step 9 Remove the front and rear doors of the air conditioner.
Issue 01 (2019-03-05)
Remove the four M10 bolts at the top of the air conditioner using an adjustable wrench.
Remove the four M12 bolts at the bottom of the air conditioner using a socket wrench.