4.4 Installation at the transformer factory

4.4.1 Removal of the lower draw rod with bottom contact from the bushing

Overview
The bottom contact is usually installed in the bushing when it is delivered from Hitachi ABB Power Grids,
the first step at the transformer factory is thus to remove it.
4
Lower draw rod
33
Bushing
35
Upper draw rod
36
Bottom contact
39
Lower joint
Procedure
1.
Install the shaft (37) of the hydraulic jack on the
draw rod (35), and put the box-spanner (13) on
the shaft (37) .