ABB GOE 2600 Installation And Commissioning Manual page 28

Transformer bushing
Table of Contents

Advertisement

Procedure
1.
Install the springs (15), the guiding sleeves (16),
the pressing ring (17), and the hex screws M10
(18) to the bottom end of the bushing.
2.
Put the winding cables through the end-shield.
3.
Install the winding cables to the bottom contact.
4.
Lift the bushing above the opening in the transformer.
28
CAUTION!
Make sure that there is no tension in
the winding cables.  Tension in the
winding cables will cause damage to
the draw rod or cables.
Torque
40 Nm
Torque
68 ±6 Nm
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23