ABB GOE 2600 Installation And Commissioning Manual page 17

Transformer bushing
Table of Contents

Advertisement

9.
Lower the bushing onto the support blocks.
10.
Remove the soft lifting sling at the top part of the porcelain insulator.
End of instruction
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lf121085-d1zsc902110-aaa

Table of Contents