ABB GOE 2600 Installation And Commissioning Manual page 33

Transformer bushing
Table of Contents

Advertisement

5.
Install the washers and nuts. Tighten the nuts in a
crosswise sequence.
6.
Install the draw-rod nut (10):
1.
Apply a generous quantity of Molykote
Multilub to the nut (10), and the threads of
the draw rod.
2.
Install the washer (11) and nut (10) on the
draw rod, tighten with your fingers.
3.
Remove excess Molykote Multilub with a rag.
7.
Tighten the draw-rod nut (10).
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
CAUTION!
If the nut (10) is not lubricated correctly,
it will not be tighten to the correct
torque. This can cause the bushing
to fail.
CAUTION!
Make sure that the centering ring (28)
is in position. It is necessary for the
correct installation of the draw rod.
NOTE!
Make sure that more than 10 mm of
the threads on the upper draw rod (35)
is remaining.
Torque
Please refer to the transformer
documentation.
Torque
10 Nm
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lf121085-d1zsc902110-aaa

Table of Contents