4.5.3 Installation of the bushing with the fixed bottom contact
Overview
This procedure is only applicable for bushings with a fixed bottom contact.
The fixed bottom contact is installed when it is delivered from Hitachi ABB Power Grids.
CAUTION!
Do not remove the fixed bottom contact.
36
Fixed bottom contact
Procedure
1.
Lower the bushing into the transformer.
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
CAUTION!
Do not damage the stud bolts on the
transformer. There is a risk of metal
falling into the transformer.
NOTE!
Plastic sleeves put on two or three of
the stud bolts will help to guide the
flange, and will prevent damage to the
stud bolts.
43