NetCol8000-C(070, 130, 190) In-room Chilled Water
Smart Cooling Product
User Manual
Figure 4-20 Online boot
Step 8 Tap OK and follow instructions as prompted on the screen until the success
message for the startup is displayed on the screen.
----End
4.7 Wizard Startup
Context
The startup wizard allows for commissioning of components such as the fan,
electric heater, humidifier, and chilled water valve. It also supports automatic
operation and checking of components.
After initial power-on and startup, the screen displays the Wizard Startup screen.
You can choose to start commissioning now. You can also choose Maint > Wizard
Startup to start commissioning in future.
Tapping No or Exit, submission timeout, and system exception all result in
commissioning failures. Choose Maint > Wizard Startup to enter the Wizard
Startup screen for new commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Issue 07 (2021-12-30)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
4 Power-On Commissioning
Figure
4-21.
122