Completing The Test; Breaker Monitoring Sscbr; Verifying The Settings - Hitachi RET670 Commissioning Manual

Table of Contents

Advertisement

1MRK 504 165-UEN Rev. K
11.14.2.4

Completing the test

Continue to test another function or end the test by changing the TestMode setting to Off. Restore
connections and settings to their original values, if they were changed for testing purposes.
11.14.3

Breaker monitoring SSCBR

Prepare the IED for verification of settings outlined in section "Testing the IED operation".
The Signal Monitoring tool in PCM600 shows the service values that are available on the Local HMI
as well.
Values of the logical signals belong to the breaker monitoring are available on the local HMI under:
Main menu/Test/Function status/Monitoring/BreakerMonitoring /SSCBR:x
11.14.3.1

Verifying the settings

1.
Connect the test set for the injection of a three-phase current to the appropriate current
terminals of the IED.
2.
If current need to be injected for a particular test, it should be done in the phase selected by the
PhSel parameter.
3.
Follow the sequence for positioning the auxiliary contacts before testing:
POSCLOSE
POSOPEN
4.
Test of CB contact travel time
4.1. Test the set timing defined by OpenTimeCorr, CloseTimeCorr, tTrOpenAlm and
4.2. Change the status of the auxiliary contacts such that travel time to open TTRVOP and
4.3. Check that TRVTOPAL and TRVTCLAL are activated.
5.
Test of CB status
5.1. Test the set current level defined by AccStopCurr.
5.2. Check the CLOSEPOS output by changing the POSOPEN to 0 and POSCLOSE to 1.
5.3. Check the OPENPOS output by changing the POSOPEN to 1 and POSCLOSE to 0 and
5.4. Check the circuit breaker is in INVDPOS if auxiliary contacts read same value or CB is
6.
Test of remaining life of CB
6.1. Test the set timing defined byRatedOperCurr, RatedFltCurr, OperNoRated, OperNoFault,
6.2. Vary the phase current in the selected phase from below rated operated current,
6.3. The remaining life of CB output CBLIFEPH is estimated when the CB is changed from
6.4. CBLIFEAL is activated as soon as CBLIFEPH is below the set CBLifeAlmLevel value.
7.
Test of accumulated energy
Transformer protection RET670
Commissioning manual
tTrCloseAlm.
travel time to close TTRVCL exceed the respective set values (tTrOpenAlm and
tTrCloseAlm). The measured travel time for opening and closing is shown on TTRVOP and
TTRVCL respectively.
also inject the current in the selected phase slightly lower and higher than AccStopCurr
set value. Only for a current lower than set AccStopCurr should activate the output
POSOPEN.
open and inject the current in selected phase more than AccStopCurr set value.
DirCoef, CBLifeAlmLevel.
RatedOperCurr to above rated fault current, RatedFltCurr of a breaker.
closed to open position. Check that the output CBLIFEPH is decreased with a value that
corresponds to the injected current.
© 2017 - 2022 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
GUID-1A0D8AF0-4C48-45E8-B31D-96734ED1A4D2 v2
GUID-10D26C82-79FF-4EAD-AE4A-2F2DBE965087 v3
GUID-962A344D-5F8D-49A6-B3AC-29C7FEED0A3D v4
0
1
0
0
Section 11
0
1
265

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 670 series

Table of Contents