Creating the Drive Project OFFLINE
As you can see in Fig. 3-14, the project Wizard has created Project_2, drive
unit SINAMICS_ CU320, and a Control_Unit in the project navigator.
Fig. 3-14
Section 3.2 shows you how to configure the components for the drive unit used
in this example.
3-42
STARTER project navigator "Project_2"
SINAMICS S120 Getting Started with the STARTER Commissioning Tool – 03/2006 Edition
Siemens AG 2006 All rights reserved