8 Tool Management
8.2

Startup sequence

8.2
Startup sequence
8-72
You can either start up tool management together with ShopMill startup (see
Section 4.2 "Initial Startup Sequence") or subsequently.
To start up tool management proceed as follows:
1. NCK commissioning
2. PLC commissioning
3. Adapt display machine data
4. Create tool–changing cycle
If your machine already features a tool management, you do not have to install
a separate tool management for ShopMill. That is, the startup of NCK, PLC and
tool–changing cycle is omitted, only the display machine data have to be
adapted.
For a precise description of tool management startup please refer to:
References:
/FBIW/, Description of Functions Tool Management
Note
With PCU 50.3 you can also start up tool management (generating
configuration file and PLC data) via the CNC–ISO operator interface.
References:
/FBW/, Description of Tool Management Functions
SINUMERIK 840D sl Commissioning Manual CNC: ShopMill – 11/2006 Edition