Site Planning And Requirements; Enclosures; Power Requirements; Location Specification And Design - ABB XRC G5 User Manual

Hide thumbs Also See for XRC G5:
Table of Contents

Advertisement

2

Site planning and requirements

The XFC
G5
and XRC
G5
specifications described in this section.
The installation of the meters, senior fitting, tap valves, or other peripheral equipment, is outside the
scope of this document.
PCCU32 is required for initial configuration and to place the device in service. Download the correct
PCCU32 version. Versions older than 7.65 are not compatible with XSeries
WARNING – Bodily injury: Select compliant equipment listed in this section. Carefully
!
review the specifications. Failure to comply with these specifications may create unsafe
conditions, resulting in bodily injury and equipment damage.
NOTICE – Equipment damage or loss of data: Equipment damage or loss of data.
Customers who supply their own ancillary equipment must ensure that equipment is
compliant with the requirements in this document.
The aluminum enclosure consists of a hinged-door box. The enclosure is rain-proof; it has a corrosion-
resistant seal between the outside elements and the components. It is rated TYPE 3R or IP54.
Plan the installation based on enclosure dimensions and battery weight per model. For details on the
enclosure weight and specifications, refer to the Data Sheets.
Plan the power equipment installation based on the requirements for the power source selected. ABB-
approved battery/charger systems and external power supplies are available. See section
supply equipment
for details. Space and materials should be available for power equipment installed
outside of the enclosure.
Determine the device installation location. Review the options in
Ensure the required mounting kits and materials are available.
The installation location must allow access to the XFC
connections. More information is available in section
For solar panel use, determine where and how to install the solar panel outdoors. For optimum
charging, avoid placing the solar panel where it will be in shadow any part of the day. More
information is available in section
installation of the power equipment. All wiring must be complete before the device is energized.
All onboard screw terminal connectors support a wire gauge range of 12 AWG to 22 AWG.
IMPORTANT NOTE: The smaller the wire gauge, the larger the wire size. If terminal pins
may connect to more than one wire, select appropriate wire size to ensure the terminal
contact can accommodate the wires.
Select the wire gauge compliant with the local electrical code for the type of signal on the connection,
voltage and current load, and wire length.
2 6 | XSE RI ES G5 | 2 10 6 02 6MNAA
enclosures, power sources, wiring, and location must comply with the
4.2 Install the solar panel.
G5
3 Installation.
or XRC
, power sources, cables, and
G5
G5
3
Installation.
Section
3 Installation
devices.
1.5 Power
describes the

Advertisement

Table of Contents
loading

This manual is also suitable for:

X g5 seriesXfc g5

Table of Contents